Minutes of the Kick off meeting
D1.1
Feb 19, 2020
By : Thales Alenia Space in France (Coordinator)
Those minutes present the first actions to put in place, the first deliverables and milestones to prepare and organise the project with the future different meetings. This document summarizes the minutes of discussions from the kick-off meeting. It includes a copy of the hand-outs, and is signed by a representative of each partner.
The project is kicked-off (official start date is December 1st).
First task will be dedicated to specification of both the flight system and the demonstrator and will be done by TASF.
Specification of the overall performance for the instrument and the associated demonstrator
D2.1
Issue 01 – 17/02/2020
By : Thales Alenia Space in France
The “Specification of the overall performance for the instrument and the associated demonstrator” is the output of Task 2.1 of WP2 “Architecture, specification and development plan for the VIDEO instrument and demonstrator”. It provides the technical requirements applicable to the Flight instrument and to the Demonstrator, taking into account a trade-off between market expectations and technical feasibility, down to the individual requirements for the Sub-assemblies (mirrors, structure, detectors, video channel).
It is an input to the preliminary design of the instrument and to the individual technologies development plan definition.
Data Management Plan
D1.9
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
The Data Management Plan describes the list of data, documents and information that has to be exchanged between partners and identifies which information shall be publicly released, at what time, and by what means. The document will be updated at the middle point of the project and at the end, reporting how the implementation of the plan has been done.
Risk Register
D1.10
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
The Risk Register builds up on the preliminary list of the proposal, describing the type of risk, and the severity level, as per ECSS standard. Above a given severity level, risk mitigation actions are be described and implemented.
The current version of the Risk Register is in the Risks Identification phase.
Dissemination Plan
D7.4
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
The first version of this document describes how public information will be managed, which targets will be chosen, which level of information will be disseminated.
The final version will describe the status of dissemination and how the dissemination activities have complied to the expectations. Realized and expected impact will be assessed.
Knowledge & Results Exploitation Plan
D7.6
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
The first version of this document describes the expected increase of knowledge and results for each partner, and identifies whether it will be shared foreground or not, together with the IPR rules.
The final version will list the final knowledge created in the project and how its property is shared.
Communication Toolbox
D7.8
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
This document constitutes a set of tools to be used to efficiently share information within the consortium and disseminate the outcomes of the project. It comprises:
– A website that will provide open access to general information about the project, such as project description, consortium presentation, progress status, publications.
– An internal collaborative platform to ensure efficient and secure data and documentation management for the project. This platform is limited to the members of the Consortium.
– Internal communication tools: a set of rules allowing efficient and secure communication and transfer of data between Partners.
Ethics Assessment
D8.1
Issue 01 – 13/10/2020
By : Thales Alenia Space in France
This document contains details on potential dual-use implications in the project and associated risk-mitigation strategies.
Minutes of the 2nd Executive Board
D1.2
21/10/2020
By : Thales Alenia Space in France
The EB minutes will present the work that has been performed during the last 6 months, and will prepare the future actions of the next 6 months.
Justification and description of the architecture of the instrument
D2.2
Issue 01 – 17/12/2020
By : Thales Alenia Space in France
This document gathers all preliminary technical justifications of the performance that the VIDEO instrument will fulfil, in comparison with the specification D2.1:
– Instrument general presentation, justification of technical choices
– Mechanical design
– Optical design
– Detection chain design
Technologies and demonstrator development plans
D2.3
Issue 01 – To be issued
By : Thales Alenia Space in France
Based on the architecture of the instrument D2.2, this document will describe for all technologies developed in the project how the responsible partners expect to reach the necessary maturity level, first for the demonstrator and second for the instrument itself.
Demonstrator preliminary design justification
D2.4
Issue 01 – 24/11/2020
By : Thales Alenia Space in France
Based on the demonstrator specifications (D2.1), on the flight instrument architecture (D2.2) and on the technologies maturity levels (D2.3) this document describes the preliminary design for the demonstrator. This preliminary design is the basis for further developments in the project.
Demonstrator preliminary performance simulation
D2.5
Issue 01 – 07/01/2021
By : Thales Alenia Space in France
Based on the demonstrator preliminary design (D2.4), this document describes the expected demonstrator performance.
Demonstrator preliminary performance simulation
D2.5
Issue 01 – 07/01/2021
By : Thales Alenia Space in France
Based on the demonstrator preliminary design (D2.4), this document describes the expected demonstrator performance.
Video electronics design description and justification
D5.1
Issue 01 – 15/04/2021
By : PYXALIS
This document describes and justifies the design of the camera demokit that will include the first samples of the Gigapyx sensor.
It includes interface description, user’s manual, set-up and preliminary compliance status with respect to the “Specification of the overall performance for the instrument and the associated demonstrator” D2.1.